With a lot of sensitive server computer equipment, our client was concerned about overloading their system with lackluster electrical power. It is a common mistake to overload your electrical system with various equipment that may not have been carefully selected, which causes spikes or drops in voltage, resulting in malfunction, underperformance, and, in a worst-case scenario, can lead to complete failure.

Case Study: Emergency Power

Our client’s large data center was vulnerable to a single point of failure in the form of an Emergency Power Off (EPO) button. The EPO is a vital piece in the life safety aspect of the building, but the client could hardly afford for the entire building to be taken down with a single push of a button. The customer wanted a way that could prevent any accidental shutdown of the entire data center while maintaining the integrity and legality of the EPO system.